Contact
A hand passing the keys, on a Spanish keyring, to the new owner in front of a white house with bougainvillea and a sea view

Buying process

Taking delivery of your new-build home in Spain: how the final steps work

Automatically translated from Dutch. Read the original

Your home is finished, the building cranes are disappearing and the keys are within reach. Even so, a few important steps still follow when you take delivery of a new-build home in Spain. If you know what is coming, you can approach this final stretch with confidence. Below, we set them out in the order in which they usually happen.

StepWhat happens?
1. Courtesy visitYou visit your finished home before you sign.
2. Collecting the bank chequeAt your Spanish bank, you collect the cheque for the remaining purchase price.
3. Deed and keysYou sign the deed at the notary's office and receive your keys straight away.
4. UtilitiesYour lawyer has water and electricity connected in your name, effective after two to three weeks.
5. Snagging listYou have the defects noted down, either yourself or through a technical architect, and the developer puts them right.

1. The courtesy visit: a first look at your finished home

Shortly before the deed is signed, the developer invites you for a courtesy visit. You see your home fully finished for the first time. It is an introductory visit, not an official inspection: you check that everything is as agreed in your contract and you ask your questions. Do take your time to look around calmly. The thorough check of the finish follows later, with the snagging list.

2. Collecting the bank cheque at your Spanish bank

Before you go to the notary, you call in at the Spanish bank where you hold an account. There you collect a bank cheque for the remaining purchase price. Don't have a Spanish account yet? Then first read how to open a Spanish bank account.

In Belgium and the Netherlands, payment usually goes through the notary's client account. In Spain this rarely happens: there, the bank cheque takes its place. You hand over the cheque when the deed is signed, so that the developer is only paid at the moment you become the owner.

Tip: if you also take out your home insurance through the same bank, you can usually negotiate a more favourable rate for the bank cheque, or even get it completely free of charge. Wondering which other costs are involved? Read which costs come on top of the purchase price and the hidden costs of a property in Spain.

3. Signing the deed and receiving the keys

Then comes the big moment: you sign the deed (escritura) at the notary's office. From that moment you are officially the owner, and you receive the keys to your home straight away. Your lawyer prepares everything and assists you during the signing. Want to know why this matters? Then read do I need a lawyer when buying Spanish property? or our legal guide to buying a home in Spain.

4. Connecting the utilities

After the deed, water and electricity must be connected in your name. Your lawyer usually arranges this for you, so you don't have to phone the Spanish utility companies yourself. Allow two to three weeks after the deed for the connections to be effectively in place. So don't plan your first stay for the day after the signing.

5. The snagging list: having defects put right

Afterwards, a snagging list is often drawn up: a list of all the defects and unfinished details in your home, from a scratch in the parquet to a door that doesn't close properly. The developer then rectifies these points.

Preferably do this only once the utilities are connected. With water and electricity, you can have everything checked in full: the lighting, the sockets, the air conditioning, the kitchen appliances, the taps, the drainage and the hot water supply.

You can draw up the snagging list yourself, or have a technical architect do it. They see more than a layperson, speak the developer's language and also follow up on the repairs. Read more about it in the power of the technical architect in the snagging list.

Even after the snagging list, you are protected: statutory guarantees apply to defects that only appear later. Read which ones in construction guarantees for new builds in Spain.

Who arranges what?

At handover, most of the work lies with your lawyer: they prepare the deed, accompany you to the notary and arrange the connection of the utilities. So we are not present or involved at every step. If you do have a question along the way, you can always turn to us. That way you can enjoy your new home on the Costa del Sol with peace of mind. Still searching? Then be sure to read the 8 checkpoints when buying a new build in Spain.

Unsure between projects?

Each article tells part of the story. In a conversation we explain what it means for your situation.

Receive a tailored selection

4.743 reviewsAccredited by the Belgian BIV (511973)