
The Spanish 'Water Superhighway': Why the Costa del Sol Is Investing Heavily in Water Security
Automatically translated from Dutch. Read the original
Water security: the Costa del Sol. Sun, sea, beaches and… a growing challenge with water scarcity. But the sunny coast is now tackling one of its most pressing problems decisively. Construction of the long-awaited 'water superhighway' has officially begun.
This is why this large-scale infrastructure investment of more than €350 million is crucial for anyone who lives on the sunny coast or goes there on holiday.
The Problem: A System from the 1960s
Did you know that a large part of the water pipes between the Costa del Sol and Málaga dates back to the 1960s? They are quite literally at the end of their working life. The public water company Acosol reports that this is leading to a growing number of 'explosive' bursts and serious leaks.
This is not merely a maintenance issue. It poses a direct and serious risk to the water supply of the coastal strip. With around 580,000 permanent residents, a figure that at least doubles in summer, water security is a top priority. Climate change, moreover, is only making periods of drought more frequent.
The Solution: A Vital 'Water Superhighway'
The water superhighway is a robust new water link intended to arm the region against drought. It is an ambitious project that will connect the Costa del Sol, Málaga and the Axarquía (east of Málaga).
This new 'lifeline' will connect the crucial La Concepción reservoir (near Marbella) better with the rest of the western coastal strip. The aim is simple: to make the water supply more flexible and 'robust', leaving the region less vulnerable and able to distribute water more efficiently in times of need.
The First Steps: A Technical Feat
The matter is urgent, as the first phase of the water security project has already been awarded for more than €13 million!
The first section focuses on renewing pipes between Torrequebrada (Benalmádena) and El Pinillo (Torremolinos). Although this phase covers only about 1 kilometre, it is a huge technical challenge:
- The Cercanías railway line crosses the area.
- The port of Benalmádena lies along the route.
- There is an enormous amount of existing underground infrastructure, such as gas and telecoms lines, that has to be taken into account.
- Even geological variation and the possibility of archaeological finds add to the complexity.
The new pipe will have a substantial diameter of 800 millimetres and will be buried at a depth of at least one metre.
Planning and Outlook
There is no time to lose for this water security project: the works may last only 8 months.
With the start of the works, the Costa del Sol is making a strategic leap towards a more sustainable and more secure future. The water superhighway is more than just a pipeline; it is a vital investment in the lifeline of one of Spain's most popular regions.
Source: Inspanje.nl



